Lemcon Malaysia
EV Charging

Turnkey EV charging, built for Malaysia.

Lemcon designs, builds, energises and maintains EV charging sites. AC or DC, single-phase or three-phase. One accountable partner from the first survey to remote monitoring.

EV charging station built by Lemcon
Charging for every location

Matched to your power supply and your traffic.

Electric car charging at a wall charger

AC charging

7 kW · Halisa pedestal

For shops, workplaces and homes where cars park for two hours or more.

Row of DC fast chargers

DC fast charging

30 kW and 60 kW · CCS2

An 80% charge in 30 to 60 minutes, for busy commercial sites.

Charger under a solar canopy

Single-phase DC

No three-phase upgrade

30 or 60 kW fast charging on a single-phase supply. Suited to sites without three-phase power.

Several chargers at a charging hub

Charging hubs

Up to 1 MW

Multi-charger sites for highway stops, large malls and fleet depots, with load management.

From first visit to handover

One company. One contract. One point of accountability.

  1. SurveyPower supply, civil works, approval needs and landlord coordination.
  2. DesignElectrical design, layout and drawings to the Energy Commission EV charging guidelines.
  3. ApprovalsLocal authority approvals and the supply application to TNB, SESB or Sarawak Energy, prepared with registered partners.
  4. BuildCivil and electrical works, charger mounting and SiteConnect set-up.
  5. TestEnd-to-end testing, metering, safety and network checks.
  6. Hand overAs-built records, operator training, warranty and remote monitoring.
Halisa charging pedestals
A Lemcon design

The Halisa charging pedestal.

Every safety feature in one weatherproof unit. Each pedestal is built and field-tested at the Lemcon facility in the Philippines, then sent out ready to install, even at remote sites.

  • IP65 weatherproof housing
  • Built-in controls and safety breakers
  • LTE dual-SIM failover
  • Wi-Fi 6 for CCTV and diagnostics
  • CCTV integration
  • Remote reboot through SiteConnect
SiteConnect

Every charger connected from day one.

SiteConnect gives real-time visibility and remote control for every site. Routine issues are fixed from the Lemcon operations centre, without a site visit.

Approvals

Working to Malaysian rules.

EV charging work follows the Energy Commission (Suruhanjaya Tenaga) Guidelines on Electric Vehicle Charging Systems. Installation and connection are carried out with registered partners and competent persons, as the guidelines need.

Planning a charging site

Share your location and power supply. Our team reads every enquiry and replies by email.

Start an EV enquiry
Ask a Question